Trimble CrewSight Testimonial with Matt Ogle Safety Manager at JE Dunn
Trimble CrewSight Testimonial with Matt Ogle Safety Manager at JE Dunn Read More »
BuildingPoint takes a look at the importance of Virtual Design & Construction (VDC) services.
Getting Started With VDC Services Read More »
Did you know that BuildingPoint offers a number of specialized and customized services to help contractors integrate Virtual Design and Construction on their building projects?
VDC Services ‐ BP Mid America Read More »
The BPMA Team found new ways that we could use our tools and experience to help document historic and prominent locations. After a couple of months trying to find a way that we could leverage our Trimble tools to help in an ethical or social way, we were approached by the Architecture & Design department
BuildingPoint Mid-America Preserves History with Modern Technology Read More »
The Trimble X7 design is unique in both form and function, integrating a survey-grade servo drive with high-speed scanning, automatic self-leveling and an integrated camera system to deliver exceptional reliability and productivity in the field. Trimble X7 Laser Scanner Features The Trimble X7 is a high-speed 3D laser scanning system with new innovations to simplify
Introducing the Trimble X7 Laser Scanner Read More »
Pouring and placing concrete for flatwork or vertical elements of a building has always been one of my favorite construction processes to watch be installed. All the hours spent digging, scraping and proof rolling the ground, then establishing building corners installing below grade utilities, installing reinforcing steel, forming areas to contain the concrete pour. Then
Technology “Flattens” the Concrete Curve Read More »
Here at BuildingPoint Mid-America we offer a wide range of layout solutions to help fit your needs as well as your price point. We also offer a variety of financing and lease options to help reduce your initial investment in our offered technology. We want to share those solutions with you. Download our latest newsletter
BPMA Technology Journal | 2021 Volume 1 Read More »
In this webinar recording we discuss the processes involved with leveraging the full potential of the Building Information Model for layout purposes. We also outlined process for exporting an IFC model from the design authoring software.
BPMA Webinar Leveraging Models for Layout Read More »
Webinar discussing data creation inside Trimble Field Link. Showing file opening and file importing sequences as well as creating data and points on the fly . Examples given for creating points using a drawing, a model or creating data without a drawing.
IN this video we review the steps necessary to establish a connection between the tablet and the RPT600. Please note that the RPT600 is our WiFi only connection. This connection is different than the connection to any of our RTS Series guns and their 2.4GHz Radio.
How to connect a tablet to the RPT600 Read More »
IN this video we demonstrate some techniques for setting up a tripod, placing a Robotic Total Station on that tripod and leveling the instrument. This demonstration is suitable if you use a robotic total station, a manual total station of a transit. We also point out the reason why we prefer the use of our
Tripod Setup and RTS Leveling Read More »
In this video we walk you through the process of using the onboard digital level in a Trimble Robotic Total Station. This is our preferred method of leveling your instrument and we walk you through the steps and how to adjust the accuracy of the onboard digital level.
RTS Digital Bubble Level Read More »
Our Trimble Robotic Total Stations allow users to use both a viable and invisible laser to perform layout tasks and collect data. IN this video we introduce the basics of how those two modes work and how the user can change the settings to perform layout and collection tasks using the laser or the more
Trimble RTS – Collecting Data in Prism and Laser Mode Read More »
The best way to setup and use your Robotic Total Station is to set it up in a good location and then have clear line of sight to perform your layout tasks. Here we cover one of the first steps in completing layout tasks and that is establishing the instrument location on the building site
Trimble Field Link – Control Setup and Resection Read More »